
This is a work-in-progress which will ultimately include a rendering of trees planted along the street. This work was commissioned by Ignition Architecture working in conjunction with the City of Alameda. The architect consulted with us after severeal unsuccessful l attempts to create an image on her own. The challenge was to create a streetscape that would show the store fronts along Park Street without too many visual liabilities. We determined that the best time to capture this image would be on a Saturday morning when traffic would be at a minimum and there would be a minimum of parked cars. Apparently there was some concern about the removal of trees in the fall, you can find more info on the Alameda Patch. The City of Alameda cooperated and provided an assistant to control traffic and move barricades that had been set up to project impending cement work on the street.